Carabeyto Calinuur SWRO Siting
Wadi estuary gallery intake · 44.680°E · 37 km west of Berbera port · MCA score 4.44/5.0
NB18 recommended W2 Western Headland (44.933°E) based on a 6-criteria analysis. NB19 extends this to 9 criteria and discovers that the Wadi Calinuur estuary at 44.680°E— 37 km west of Berbera — creates an alluvial fan deposit capable of hosting a subsurface gallery intake. The gallery delivers SDI < 0.8 and turbidity < 0.2 NTU, completely eliminating the UF pre-treatment train. The savings in plant complexity justify the longer 37 km product pipeline. The Carabeyto Calinuur site scores 4.44/5.0 vs W2’s 4.12/5.0.
Why the Wadi Estuary Changes Everything
Seawater infiltrates 10–20m through coarse river-deposited gravel and sand before reaching the collector pipes. This natural filtration reduces SDI from ~4.5 (open sea) to < 0.8 — equivalent to a 0.02 µm ultrafiltration membrane, without any membrane. The entire UF pre-treatment train is eliminated.
Wadi floods flush and regenerate the alluvial sand filter — fines are washed out, porosity is restored. The gallery collectors are 12–20m below grade: the wadi flood travels over them, not through them. Plant buildings are protected by a 2.5m AMSL reinforced concrete berm (1,350m long) and floors set at FFL +1.8m AMSL.
Open intakes kill fish larvae, plankton, and small organisms at the screen (impingement) or through the membrane system (entrainment). A gallery intake has no screen — nothing enters except water molecules. This is the most powerful argument for environmental permits in any jurisdiction, and is typically decisive for Red Sea / Gulf of Aden SWRO plants.
The 37 km product pipeline to Berbera is a longer civil commitment than W2's 7.1 km, but the elimination of UF pre-treatment (lower energy, fewer chemicals, fewer cleaning cycles, less operator time) more than compensates across the project lifetime. CC scores higher overall in the 9-criterion MCA (4.44 vs 4.12 for W2).
Gallery Intake — Process Train
- · Gallery at 12–20m depth: physically isolated from flood surface water
- · RC flood berm: 2.5m AMSL, 1,350m length, seaward face
- · Plant floor level: FFL +1.8m AMSL (above Q₁₀₀ of +1.5m)
- · Turbidity auto-isolation valve: closes at SDI > 1.5
- · 4,000 m³ buffer tank: 2-hour supply during isolation event
- · Q₁₀₀ Wadi Calinuur: ~560 m³/s (Rational Method, C=0.65, A=180 km²)
Four-Site Multi-Criteria Comparison (NB19)
Nine weighted criteria scored 1–5 across four candidate sites. Airport corridor avoidance (20% weight) immediately rejects E1 (east breakwater). Water quality / SDI (25%) and marine ecology (5%) strongly favour the gallery intake at CC. Pipeline length (8%) is the only criterion where CC loses to W2.
| Site | Location | Intake type | SDI | MCA score |
|---|---|---|---|---|
| CC ★ | 44.680°E — Carabeyto Calinuur | Subsurface gallery (wadi alluvial fan) | < 0.8 | 4.44/5.0 |
| W2 | 44.933°E — Western Headland (NB18) | Open sea intake | 3.8 | 4.12/5.0 |
| W3 | 44.780°E — Far West Cape | Open sea intake | 3.2 | 3.81/5.0 |
| E1 ✗ | 45.055°E — East Breakwater | Open sea intake | 4.8 | 2.15/5.0 — REJECTED |
9 Scoring Criteria
Wadi Geology (CC site)
Estimated from regional alluvial fan geology. Ground investigation required (8 boreholes to 30m).
CC vs W2 — key trade-offs
Carabeyto Calinuur — Site Location
Carabeyto Calinuur at 44.680°E, 10.476°N — 37 km west of Berbera port, at the mouth of Wadi Calinuur. The SWRO plant footprint (70 ha, 1,000 m × 700 m) is shown as the teal polygon. The wadi channel (schematic) runs south from the site into the Golis escarpment catchment (~180 km²).
Brine Management at Phase 3
| Parameter | Value |
|---|---|
| Product capacity (Phase 3) | 500,000 m³/day |
| Recovery rate | 45% |
| Feed flow required | 1,111,000 m³/day = 12.86 m³/s |
| Brine flow | 611,000 m³/day = 7.07 m³/s |
| Brine TDS at diffuser | ~47 g/L (+11.5 g/L excess above ambient) |
| Mixing zone (permit) | < 500m radius (1:100 dilution) |
| Ambient salinity restored | Within 1.5 km downstream (westward) |
| Diffuser position | 300m offshore, 8m depth |
| Diffuser type | Multi-port submerged (forced mixing >3 m/s) |
| Longshore current | 0.15–0.35 m/s westward — away from Berbera |
- · Zero impingement — no fish or larvae drawn to a screen
- · Zero entrainment — no plankton processed through pumps/membranes
- · Reduced chemical discharge (no coagulant, reduced cleaning frequency)
- · Brine dispersed 37+ km from major fishing ground (Berbera coast)
- · Wadi freshwater pulses (Gu/Deyr seasons) provide additional mixing
- · Construction impact: gallery trench on land, no marine construction
- 1. Ground investigation: 8 boreholes to 30m, grain-size, falling-head permeability
- 2. Wadi catchment DEM analysis (Copernicus D8 flow accumulation)
- 3. SWRO gallery design feasibility study (specialist consultant)
- 4. ESIA scoping report (NEPA Somaliland)
- 5. Coastal current survey (ADCP, 12 months) for brine dispersal confirmation
- 6. Update NB12 pipeline alignment to reflect 37km CC trunk main