35-year horizon 2026–2060 · 8% AfDB discount rate · 3 scenarios · NPV/IRR · DFI checklist

USD 4.65B
35-year horizon
Total programme
USD 1.64B
Phase 1–3
Govt/DFI share
>12%
AfDB threshold 8%
Economic EIRR
Positive
base case at 8%
Project NPV
~2038
base scenario
Payback year
USD 1.5B
per year at maturity
Phase 3 revenue

Three Scenarios — 35-Year Horizon

Optimistic scenario

Revenue +20% vs base · No construction delays · Phase 2 BEZ fully subscribed

Revenue Year 10USD 420M/yr
Revenue Year 35USD 1,800M/yr
Payback year2036
EIRR>18%
Base case scenario

Revenues as modelled · Phase 2 slight delay · BEZ 70% uptake

Revenue Year 10USD 320M/yr
Revenue Year 35USD 1,500M/yr
Payback year2038
EIRR>12%
Pessimistic scenario

Revenue –20% · CAPEX +20% · 2-year delay · Partial BEZ uptake

Revenue Year 10USD 200M/yr
Revenue Year 35USD 1,100M/yr
Payback year2042
EIRR>8%
Even the pessimistic scenario exceeds AfDB's 8% EIRR threshold, confirming the programme is viable across the full risk range at pre-feasibility level.
Interactive analysis

Cumulative Revenue — 3 Scenarios (USD M)

2026–2060 · Conservative / Base / Optimistic

CAPEX by Sector (USD M)

Phase 1–3 public/DFI capital · Private PPP not included

Annual Revenue Streams at Maturity (USD M/yr)

Base scenario · Phase 3 steady state ~2050

Revenue Streams (USD M/yr)

Revenue streamPhase 1Phase 2Phase 3
Agriculture exportsUSD 35MUSD 320MUSD 637M
BEZ/SEZ fees + fiscalUSD 15MUSD 45MUSD 120M
Port throughput (govt)USD 22MUSD 35MUSD 55M
Water tariffUSD 10MUSD 40MUSD 100M
Power export—USD 20MUSD 80M
Livestock & other agri—USD 58MUSD 80M
Tourism & real estateUSD 10MUSD 35MUSD 80M
TOTALUSD 92M/yrUSD 553M/yrUSD 1,152M/yr
Revenues at phase maturity · Agriculture is dominant stream

Financing Mix (USD 1.64B govt/DFI)

40%
AfDB ADF — USD 656M
0% interest · 40-year term · 10-year grace
30%
World Bank IDA — USD 492M
0.75% service charge · 25-year term · 5-year grace
15%
IsDB — USD 246M
2.0% mark-up · 20-year term · Istisna'a structure
10%
Somaliland Govt — USD 164M
Land contribution + in-kind · deferred schedule
5%
PPP / Blended — USD 82M
Co-investment vehicles + blended finance guarantee

CAPEX by Sector (full programme)

SectorPhase 1Phase 2Phase 3Total
Water (SWRO + pipeline + dam)USD 390MUSD 390MUSD 304MUSD 1,084M
Energy (solar + CSP + grid)USD 155MUSD 120MUSD 760MUSD 1,035M
Port & BEZUSD 225MUSD 460MUSD 530MUSD 1,215M
Agriculture (irrigation + processing)USD 180MUSD 310MUSD 450MUSD 940M
Urban infrastructure + beautificationUSD 100MUSD 150MUSD 125MUSD 375M
TOTAL CAPEXUSD 1,050MUSD 1,430MUSD 2,169MUSD 4,649M
Phase 1 govt/DFI: USD 1.05B · Port Phase 2 is DP World private capital (USD 400M of Phase 2 total)

DFI Readiness Checklist

✓
Pre-feasibility study (15 notebooks)
Complete
✓
Economic EIRR > 8%
Confirmed (>12%)
✓
AfDB ADF eligibility
Confirmed
✓
Financial model (NPV/IRR/scenarios)
NB15 complete
○
Concept Note submission
Q2 2027
○
Project Preparation Unit
Cabinet decree needed
○
Hydrological survey
ToR A not issued
○
ESIA (18-month process)
Scoping not started
○
Geotechnical investigation
ToR D not issued
○
Full feasibility report
2028 target
○
Board presentation
Q4 2028 target
○
Loan effectiveness
Q1 2029 target

90-Day Critical Actions

A01
Issue hydrological ToR
Week 1–2 · MWR · USD 850k
A02
Issue UAV survey ToR
Week 1–3 · Municipal · USD 380k
A03
Commission ESIA scoping
Month 1–3 · EPA + MoF · USD 2.5M
A04
Issue geotechnical ToR
Month 1–2 · MWR · USD 1.2M
A05
Submit AfDB Concept Note
Month 2–3 · MoF · No cost
A06
Cabinet: establish PPU
Month 2–3 · Cabinet decree

Library: numpy_financial · scipy · matplotlib

NB15 uses numpy_financial for NPV and IRR calculations across all three scenarios.scipy for tornado chart sensitivity analysis (±20% on 6 key variables). 35-year cashflow from 2026 to 2060, 8% AfDB discount rate. All calculations reproducible from build_nb15.py.

Your feedback on this analysis

0/1000 characters

Your feedback is read by the Berbera planning team. All submissions are treated with respect.