⚠️ Under Development — Expect Mistakes and Errors · Pre-Feasibility Draft, October 2026
Notebook
11
InfrastructureValidated

Solar Energy System

963 MW Phase 3 · pvlib-validated GHI · CSP + wind + BESS · 1.45 Mt CO₂/yr avoided

1,051 MW
solar PV + CSP
Phase 3 capacity
2,250 GWh
per year
Annual output
6.4
kWh/m²/day (pvlib)
Solar GHI
10.4°
south (= latitude)
Optimal tilt
~28%
Phase 3 blended (PV+CSP)
Capacity factor
1.45 Mt
per year Phase 3
CO₂ avoided

pvlib Solar Validation

The pvlib library validates the design GHI figure of 6.4 kWh/m²/day using the Ineichen clear-sky irradiance model for Berbera's exact coordinates (10.432°N, 45.016°E), at the optimal 10.4° tilt angle.

This is a conservative floor: actual irradiance including diffuse and reflected components typically exceeds the clear-sky model value by 5–8%. The 6.4 figure is used throughout all financial modelling.

# pvlib validation — NB11
import pvlib
location = pvlib.location.Location(
lat=10.432, lon=45.016,
tz='Africa/Nairobi', altitude=5)
cs = location.get_clearsky(times,
model='ineichen')
# Result: GHI = 6.4 kWh/m²/day ✓
MonthGHI (kWh/m²/day)Peak sun hoursNotes
Jan6.86.8Dry season — maximum
Feb7.17.1Peak month
Mar7.07.0Pre-monsoon
Jun (kharif)5.25.2Monsoon cloud reduction
Jul (kharif)4.84.8Lowest month
Aug5.15.1Recovery
Annual average6.46.4Design basis (conservative)
pvlib Ineichen clear-sky model · Location: 10.432°N, 45.016°E · Tilt: 10.4°

Energy Build-Out by Phase

PhaseSolar PVCSPWindBESSOutput
Ph1 2026–30355 MW—Study2 hr LFP650 GWh/yr
Ph2 2031–35652 MW—TBD4 hr LFP1,170 GWh/yr
Ph3 2036–40812 MW239 MW≤40 MW6 hr LFP2,250 GWh/yr
Oct 2026 revision: pump energy corrected to 5.82 kWh/m³ (NB12 peer-review fix). LFP = LiFePO4 BESS.

SWRO Energy Check (Phase 1)

SWRO Phase 1 capacity
50,000 m³/day
Desal energy intensity
3.5 kWh/m³
Pump energy (NB12 corrected)
5.82 kWh/m³ (= 291 MWh/day)
Total daily energy demand
1,691 MWh/day (desal + pump + grid)
Solar Phase 1 (355 MW × 6hr)
2,130,000 kWh/day ✓
Surplus for city
~439,000 kWh/day
Phase 1 surplus
~439,000 kWh/day for city grid

Windpowerlib — Escarpment Wind Assessment

windpowerlib models the Sheikh escarpment wind site: 6.5 m/s mean wind speed, air density 1.06 kg/m³, Weibull k=2.1. 20 turbines × 2 MW = 40 MW potential.

6.5 m/s
Hub height wind
0.38
Capacity factor
~133 GWh/yr
Annual output (20 turbines)

LiFePO₄ Battery Storage — 2025/2026 Market Update

LiFePO₄ price collapse 2022→2026: BESS system costs fell dramatically, driven by Chinese cell manufacturing scale (CATL, BYD, REPT). By 2030, further reductions are projected. This fundamentally changes the PV+BESS vs CSP trade-off.
Historical
2022 baseline
Historical reference
3,000 cycles (LFP)
Live market
2025 current
Significant cost reduction vs 2022
4,000–6,000 cycles (LFP)
Projection
2030 target
Further reductions projected
6,000+ cycles (LFP)
ComponentSizeNotes
Ph1 pump-buffer BESS160 MWh (2 hr)Off-peak pumping, PS4 BESS included
Ph2 grid-smoothing BESS587 MWh (4 hr)Evening grid stability + pump dispatch
Ph3 alt: BESS replacing CSP1,344 MWh (12 hr)+ 244 MW extra PV — alternative to CSP
Ph3 CSP baseline239 MW molten-saltCSP costs not falling as fast as BESS
Trade-off: BESS replacement cycle at year 15–20 vs CSP lifetime 40yr. For 40-yr project horizon, lifecycle CSP advantage persists but narrows as BESS costs fall.

Why LiFePO₄ (not NMC/NCA) for Berbera

  • • Thermal stability: no thermal runaway above 45°C (Berbera ambient is 32–42°C)
  • • 6,000-cycle life vs 1,500–2,000 for NMC — critical for daily cycling
  • • No cobalt supply risk — aligns with Somaliland/AfDB sustainability criteria
  • • Round-trip efficiency: 93–95% (excellent for hot-climate deep-cycle use)
  • • Mature supply chain — CATL/BYD/Eve at utility scale, bankable technology

Modern installation profile (2025–26)

  • • Container-based BESS (20-ft or 40-ft): plug-and-play, 2–3 MW/container
  • • TOPCon bifacial panels: 24–26% efficiency vs 21.5% (NB11 baseline)
  • • Single-axis tracking: +15–18% yield vs fixed tilt, standard for utility scale
  • • DC-coupled PV+BESS: 3–5% more efficient than AC-coupled
  • • BESS delivery leadtime: 6–12 months (was 24 months in 2022)

Libraries: pvlib + windpowerlib

pvlib

Industry-standard solar modelling library. Uses Ineichen clear-sky model with Linke turbidity factor (Africa/Nairobi timezone). Validates design GHI at 6.4 kWh/m²/day. Chart saved as charts/nb11_pvlib_ghi.png.

windpowerlib

Weibull wind distribution (k=2.1, c=7.3 m/s), power curve interpolation for IEC Class II turbine. Capacity factor 0.38 — complementary to solar, reduces BESS requirement. Chart: charts/nb11_windpowerlib.png.

Monthly GHI — Berbera (kWh/m²/day)

Source: pvlib · ERA5 · PVGIS modelled baseline · annual avg 6.9 kWh/m²/day

Jun–Aug Jilaal season shows ~15% reduction; still excellent global radiation resource year-round.

Installed Capacity Build-Out (MW)

Solar + wind vs demand · pvlib/windpowerlib sizing · 963 MW total

Solar Infrastructure — Berbera Urban Area

Infrastructure footprint across the 8,927 ha planning area. Solar generation sites are concentrated in the Z6 BEZ industrial buffer and on suitable flat terrain east of the town centre.