Technical Glossary
Definitions for all acronyms and technical terms used across the Greater Berbera Development Programme notebooks. Hover over any underlined term in any notebook page to see a quick definition, or find the full explanation here.
Global Horizontal Irradiance — total solar radiation on a flat surface, kWh/m²/yr. Berbera averages ~2,200 kWh/m²/yr — one of the world's highest solar resources.
Global Horizontal Irradiance (GHI) is the total solar radiation received per unit area on a horizontal surface, including both direct beam radiation and diffuse sky radiation. It is the primary input for solar PV yield calculations. GHI is measured in kWh/m²/year or W/m². World average: ~1,500 kWh/m²/yr. Desert regions (Sahara, Arabian Peninsula, Berbera): 2,000–2,600 kWh/m²/yr. Northern Europe: 900–1,200 kWh/m²/yr. For Berbera, NASA POWER data gives a GHI of ~2,200 kWh/m²/yr — equivalent to receiving full sun for ~6 hours/day every day of the year. At a PV panel efficiency of 21% and system losses of 15%, this translates to a specific yield of ~1,950 kWh/kWp/yr (kilowatt-hours produced per kilowatt-peak of installed capacity). The NB11 solar system (963 MW peak) therefore generates approximately 1,880 GWh/year — enough to power the SWRO plant, all pump stations, and supply surplus power to the grid.
Concentrating Solar Power — uses mirrors to focus sunlight onto a thermal receiver, generating steam for a turbine. Can include molten-salt storage for 24-hour electricity generation.
Concentrating Solar Power (CSP) uses mirror arrays (parabolic troughs, heliostats, or linear Fresnel reflectors) to focus sunlight onto a central receiver, heating a heat transfer fluid (synthetic oil, molten salt, or steam) to 300–580°C. The thermal energy is used to generate steam and drive a conventional turbine-generator. Unlike PV, CSP's key advantage is thermal energy storage (TES): excess daytime heat is stored in insulated molten-salt tanks and used to continue generating electricity at night or on cloudy days without batteries. Typical TES duration: 6–14 hours at full capacity. For the NB11 Berbera energy system, CSP with 12 hours of TES is proposed alongside PV to provide baseload power (24/7 electricity for the SWRO plant, which cannot tolerate interruptions). CSP LCOE is currently USD 0.08–0.15/kWh with storage — higher than PV alone (USD 0.02–0.04/kWh) but competitive when the value of dispatchable storage is included.
Photovoltaic — solar panels that convert sunlight directly to DC electricity. The NB11 solar system has 963 MW PV capacity providing ~1,880 GWh/year.
Photovoltaic (PV) technology converts sunlight directly into direct-current (DC) electricity through the photovoltaic effect in semiconductor materials (typically silicon). Modern monocrystalline silicon PV panels have efficiencies of 20–22%. For utility-scale solar farms, panels are mounted on single-axis tracking systems (rotating east-to-west during the day) which increase energy yield by 20–30% over fixed-tilt. PV systems require no water, have no moving parts (except tracker motors), and typically have a 25–30 year operational life with gradual degradation (~0.5%/year). The NB11 Berbera solar programme (963 MW PV + CSP with storage) is sized to serve: 72.9 MW for SWRO desalination (Phase 3), 121.3 MW for water pumping, 100 MW for BEZ/SEZ industrial loads, and surplus for grid export. At Berbera's GHI of 2,200 kWh/m²/yr, 963 MW PV generates ~1,880 GWh/year — equivalent to the annual electricity consumption of ~900,000 European homes.
Levelised Cost of Electricity — average cost per kWh over a power plant's lifetime including capital, operating, and financing costs.
Levelised Cost of Electricity (LCOE) is the net present value of total lifetime costs divided by total lifetime energy production, expressed in USD/kWh. It is the most common metric for comparing different electricity generation technologies on a like-for-like basis. LCOE = (Total lifetime costs in NPV terms) / (Total lifetime energy output). For utility-scale solar PV in high-irradiance locations like Berbera: LCOE ≈ USD 0.020–0.035/kWh (2025). For CSP with 12-hour thermal storage: LCOE ≈ USD 0.08–0.15/kWh. For comparison, diesel generation in remote Somaliland: USD 0.35–0.50/kWh. The LCOE advantage of solar over diesel is 10–15×, which is why transitioning Berbera's electricity supply to solar is financially compelling. Note: LCOE does not account for dispatchability value — a fossil plant available at any hour is worth more per kWh than an intermittent solar plant, which is why the LCOE framework must be supplemented with capacity value analysis.