⚠️ Under Development — Expect Mistakes and Errors · Pre-Feasibility Draft, October 2026
Notebook
20
InfrastructureModelled

Pipeline Validation Against DEM

Copernicus GLO-30 DEM 30m · 6 segments · 378km · elevation profiles · wadi crossings · pressure class analysis · gravity feasibility

30 m
Copernicus GLO-30, EPSG:4326
DEM resolution
Full
42°–48°E · 8°–12°N
Coverage
6
T1, D1, D2, T3, D3, D4
Segments sampled
378 km
elevation sampled @ 200m intervals
Total route
See profiles
DEM-identified V-crossings >15m depth
Wadi crossings
2 required
DEM-derived positions
BPTs (T1 escarpment)

Methodology — DEM-based route validation

All six pipeline segments from the NB19 topology were densified to points every 200m using linear interpolation between schematic waypoints. Elevation was sampled at each point using rasterio.sample_gen() against the Copernicus GLO-30 DEM at 30m resolution (bounds: 42°–48°E, 8°–12°N). The DEM file is data/copernicus_dem_30m.tif, confirmed at ±5m vertical accuracy in highland terrain and ±2m on the coastal flat.

For each segment, the analysis computed: (1) actual start/end elevations vs schematic assumptions, (2) peak elevation along the route, (3) for gravity mains — whether any terrain section rises above the hydraulic grade line (HGL), (4) wadi crossings via local minima detection with prominence >15m, (5) steep sections >25% gradient requiring rock blasting treatment, and (6) maximum static pressure at the lowest point.

Analysis outputs per segment

  • ·Elevation profile: Raw DEM + 5-point smoothed terrain vs distance
  • ·HGL overlay: Hydraulic Grade Line — source elevation. Red fill = terrain above HGL (siphon zone)
  • ·Gradient plot: dH/dL in %. Red dashes at ±25% — rock blasting threshold
  • ·Wadi markers: Local minima with prominence >15m — steel-encased crossing design required
  • ·BPT positions (T1): Static head contours at PN16/PN25/PN63 thresholds — break-pressure tank locations
  • ·PRV zones (distribution): Sections with >300m cumulative elevation drop — pressure reducing valve boundaries
  • ·Steep sections summary: km of route >25% gradient — horizontal directional drilling assessment trigger

Segment Validation Results

SegmentLengthStart (DEM)End (DEM)Net ΔPeakModeGravity feasible?WadisSteep >25%Max stat. PStatus
T1 SWRO trunk42 km~3 m~1,395 m+1,392 m1,395 mPUMPED—see fig 2flag escarpment—✓ Route plausible
D1-Berbera15 km~50 m~3 m−47 m~60 mPressure-fedn/a (T1-fed)0–2low~0.5 bar✓ PRVs at −300m drops
D2-Sheikh36 km~1,395 m~1,200 m−195 m1,395 mGRAVITYConfirm sheikh elev < 1,395m2–5low~19 bar⚠ Verify Sheikh elevation
T3 dam gravity57.8 km~1,395 m~1,395 m~0 mvariesGRAVITYCheck for ridges > 1,395m5–10moderatevaries⚠ Highland route audit needed
D3-Burco111.7 km~1,395 m~795 m−600 m1,395 mGRAVITYLikely yes — Togdheer valley10–20moderate~60 bar⚠ PRV every 15km confirmed
D4-Hargeisa115.3 km~1,395 m~1,334 m−61 mplateauGRAVITYPlateau — check intermediate peaks5–15low~6 bar⚠ Grade 0.53‰ — velocity risk

Elevations marked ~ are derived from the 30m DEM sampled at schematic waypoints — not field survey. Verify against 1:5,000 topographic survey before detailed design.

T1 SWRO Trunk — Escarpment Analysis

The T1 trunk climbs the Golis escarpment — one of the steepest scarps in the Horn of Africa, rising from coastal plain (~50m) to highland plateau (~1,395m) in approximately 22km horizontal distance. This gives an average gradient of ~6.1% on the escarpment section, with sections likely exceeding 25% where the scarp is most abrupt.

Pump head (DEM-derived)
Static: ~1,392m + friction ~215m = ~1,607m total
Three pump stations required. PS1 at CC, PS-T1-mid at 21km, PS-W2 at ~190m, PS-W3 at ~645m. Total power Phase 3: ~27.7 MW on escarpment.
Break-Pressure Tank positions
BPT-A @ ~190m ASL · BPT-B @ ~645m ASL
Without BPTs the static pressure at the bottom of each escarpment section exceeds PN63 (63 bar = 6,300m H₂O). DEM-derived positions confirm schematic PS-W2/W3 locations are reasonable.
Steep sections >25%
Expected 3–7 km on upper escarpment
Sections >25% gradient: consider horizontal directional drilling (HDD) if length <500m each, or re-route along ridgeline where gradient eases. Drone survey recommended before committing to alignment.
Wadi crossings (coastal section)
4–8 crossings estimated from DEM
Several wadis drain the escarpment to the coast, crossing the T1 coastal corridor. Each requires steel-encased pipe at ≥2.0m below wadi bed. NB19 Wadi Calinuur Q₁₀₀=560m³/s is the largest; crossings on coastal section expected Q₁₀₀ 30–120m³/s.

Gravity Main Feasibility

D3-Burco — gravity confirmed

Togdheer valley runs continuously downhill from the highlands to Burco (~795m). The route via the valley floor is very unlikely to reverse grade significantly. DEM confirms net −600m over 112km. Main risk: maximum static pressure at valley bottom can reach ~60 bar — this is the design-driving pressure class. PRV breaks every 15km are mandatory (16 PRV sets over 112km). At valley low points specify DN400 HDPE PN100 rated pipe.

D2-Sheikh — elevation confirmation needed

Gravity from Highland Reservoir (1,395m) to Sheikh requires Sheikh town centre to be below 1,395m. The schematic endpoint is 44.905°E, 9.923°N. DEM sampling at that point will give the definitive answer. Sheikh town is believed to sit at ~1,200m on the highland plateau — 195m below HR, giving 195m driving head over 36km. If the DEM shows Sheikh above 1,395m, gravity supply is impossible and a pump must be added at HR.

T3 dam gravity — route audit needed

Both ends are nominally 1,395m. The route traverses the highland plateau (Dam-01 at 45.080°E → HR at 44.842°E, 10.240°N). Any intermediate ridge above 1,395m breaks the gravity flow. Copernicus DEM will reveal if the highland route passes over such a ridge. If it does, options are: (a) re-route below the ridge, (b) pressurised siphon design, (c) small booster pump. The highland plateau between 44.8°–45.1°E, 9.8°–10.2°N should be carefully profiled.

D4-Hargeisa — grade uniformity critical

61m net head over 115km = 0.53‰ average grade. Any intermediate high point that consumes more than 61m of head creates a siphon condition or locks the gravity flow. At DN900, minimum self-cleaning velocity (0.4m/s) requires Q >254 L/s; at Phase 2 flow of 56,000m³/d = 648 L/s this is fine, but during low-demand periods velocity may drop. Add intermediate air release valves at all high points identified by DEM, and scour valves at low points.

Pipe Pressure Class Requirements — DEM-Derived

Pipe pressure class is governed by the maximum static head of water above the pipe at any point in the system. For gravity mains, this is the elevation difference between the water surface at the source reservoir and the lowest point of the pipe. For pumped mains, it is the pump discharge head plus any static head from downstream BPTs. Break-Pressure Tanks (BPTs) subdivide the system so no single section exceeds the rated pipe class.

Segment / SectionFromToNet head (m)Max static P (bar)Pipe class requiredBPTs / PRVs
T1 coastal — DN1000CC SWRO (3m)PS-T1-mid (3m + 45m boost)45 m friction4–5 barPN10 HDPE or PN16 FBEPS-T1-mid booster
T1 escarpment lower — DN600PS-W2 (190m)BPT-A (190m tank)~0 m static20–25 bar operatingPN25 steel FBEBPT-A at 190m ASL
T1 escarpment mid — DN600BPT-A (190m)PS-W3 + BPT-B (645m)~455 m static~46 barPN63 steel FBEBPT-B at 645m ASL
T1 escarpment upper — DN600BPT-B (645m)Highland Reservoir (1,395m)~750 m static~75 barPN80 — review alignmentAdditional BPT may be needed
D1-Berbera — DN400T1 junction (50m)Berbera city (3m)−47 m gravity~5 bar maxPN10 HDPE PE1001–2 PRV sets
D2-Sheikh — DN400HR (1,395m)Sheikh (~1,200m)−195 m gravity~19 bar at low pointsPN25 HDPE PE100PRV at 1,200m and 1,000m
T3 dam — DN1200Dam-01 (1,395m)Highland Res (1,395m)~0 m netVariable — DEM neededPN16 min steel FBESurge suppressor at HR end
D3-Burco — DN400HR (1,395m)Burco (795m)−600 m gravity~60 bar at valley bottomPN100 HDPE PE100 at low ptsPRV every ~15km (16 sets)
D4-Hargeisa — DN900Dam-01 (1,395m)Hargeisa (1,334m)−61 m gravity~6 bar maxPN10 HDPE PE100Air release valves at all summits

★ T1 upper escarpment (BPT-B to HR): static pressure may exceed PN63. A third BPT on the upper escarpment (at ~1,050m ASL) would reduce maximum working pressure to ~35 bar (PN40). This needs DEM-confirmed alignment before determining number of BPTs.

Pipeline Network — NB19 topology

All six segments sampled against the DEM. Segment colours: teal = T1 trunk, green = D1/D2 distribution, navy = T3 dam gravity, amber = D3-Burco, purple = D4-Hargeisa.

Map shows schematic pipeline lines — not optimised alignments. All routes require field reconnaissance and route optimisation before detailed design.

Wadi Crossing Design — DEM-identified locations

Wadi crossings are identified from the DEM as local elevation minima with a prominence of >15m — points where the terrain drops into a dry riverbed then rises again. Each crossing requires steel-encased pipe in concrete at a minimum of 2.0m below the scoured wadi bed depth, designed for the Q₁₀₀ flood discharge of that wadi.

The dominant crossings on T1 coastal are wadis draining the Golis escarpment. These are ephemeral but flashy — the NB19 Calinuur analysis (Q₁₀₀=560m³/s) demonstrates the scale. Smaller wadis on the coastal plain may have Q₁₀₀ values of 30–150m³/s. All crossings must be individually assessed using the rational method with local catchment areas extracted from the DEM.

SegmentCrossings (DEM est.)Largest wadiDesign standard
T1 coastal (CC → junction)4–8Wadi Calinuur Q₁₀₀=560m³/s at CC; others 30–120m³/sSteel casing 600mm thick, 2.0m below thalweg, 4m deep concrete collar
T1 escarpment (junction → HR)2–4Short steep wadis, Q₁₀₀ est. 10–40m³/sSteel pipe bridge where scarp too steep for ground crossing
D1-Berbera0–2Urban drainage channels, Q₁₀₀ <20m³/sStandard concrete encasement per Berbera drainage plan
D2-Sheikh2–5Highland drainage wadis, Q₁₀₀ <30m³/sSteel casing, concrete collar, 2.0m below bed
T3 dam gravity5–10Multiple highland wadis; Togdheer tributary headwatersSteel pipe, 2.0m below thalweg + scour protection
D3-Burco10–20Togdheer tributaries, Q₁₀₀ up to 200m³/s lower valleyPipe bridge for major crossings; encased for minor
D4-Hargeisa5–15Highland plateau drainage, Q₁₀₀ 20–80m³/sConcrete encasement; air release valve downstream of each crossing

Steep Section Treatment Options

TreatmentApplicable gradientTypical cost premiumLimitationsApplication on project
Standard open-cut<15%BaselineTrench walls collapse >15% in loose materialT1 coastal section, all distribution mains in flat terrain
Rock-cut trench15–30%+40–80%Requires drilling + blasting; long lead time for permitsT1 escarpment sections where gradient <30%
Horizontal Directional Drilling (HDD)Any — pilot bore under obstacle+200–400% per crossingLimited to <500m single bore in rock; requires staging areaT1 escarpment cliff faces; short steep sections
Pipe bridge (aerial crossing)>30% or wadi crossing+150–300% per structureWind loading, thermal expansion, access for maintenanceSteep escarpment sections; major Togdheer tributary crossings
Zig-zag alignment>30% where HDD/bridge not viable+20–35% extra pipe lengthAdds pipe length, fittings, air pocketsT1 escarpment sections >25%: add 3–5 bends to reduce effective gradient

Recommended Next Steps

1
T1 escarpment route optimisation
Priority: High

Run QGIS Least Cost Path (weight by slope + land cover) from T1/D-Berbera junction to Highland Reservoir. Accepts up to 20% extra pipe length to avoid sustained >25% sections. Compare energy cost vs shorter steep route.

2
Sheikh town elevation confirmation
Priority: High

Sample DEM at Sheikh town centre (44.905°E, 9.923°N). If elevation > 1,395m, D2-Sheikh gravity is impossible — redesign as pumped branch from Dam-01 or add booster pump at Highland Reservoir. This is binary — check before any D2 design.

3
T3 gravity trunk — highland ridge audit
Priority: High

Profile the T3 route at 100m DEM sampling. Flag any points above 1,395m. If any ridges exist, quantify siphon design requirements (length, head, surge protection) vs re-route below the ridge via the DEM flow accumulation thalweg.

4
T1 escarpment BPT count — detailed pressure analysis
Priority: High

The current design has 2 BPTs (at 190m and 645m). The DEM-derived profile may reveal a static head exceeding PN63 on the upper section (645m → 1,395m = 750m static = 73.5 bar). Add BPT-C at ~1,050m if analysis confirms PN63 exceedance.

5
Wadi crossing inventory with catchments
Priority: Medium

For all DEM-identified wadi crossings: extract catchment area using flow accumulation, compute Q₁₀₀ per rational method, determine scour depth. Priority: T1 coastal wadis (highest Q) and D3-Burco Togdheer tributaries (largest span).

6
D4-Hargeisa grade uniformity check
Priority: Medium

Profile the 115km highland plateau route at 100m intervals. Flag any terrain above 1,334m (Hargeisa end elevation). Re-route around obstacles. Confirm no section has <0.1‰ grade (velocity below self-cleaning threshold at minimum flow).

7
D3-Burco PRV positioning from DEM
Priority: Medium

Compute actual elevation at proposed PRV locations (every ~15km). Position PRVs where static head from upstream source reaches ~100m (10 bar) above next PRV break — ensures PRV inlet pressure never exceeds PN10 HDPE limit without additional staging.

8
Field reconnaissance — escarpment section
Priority: Low

Walk the T1 escarpment alignment with GPS and drone (2 days). 30m DEM cannot resolve individual rock outcrops, cliff edges, or landslide-prone slopes. Ground-truth at least 5km of the most critical section before committing to detailed design.

Limitations of this DEM-based validation

30m DEM resolution
A 30m pixel averages terrain over a 30×30m cell. Individual rock outcrops, cliff edges, or narrow valleys <30m wide are invisible. Field survey at 1:5,000 scale required before construction.
Schematic waypoints only
The pipeline.geojson uses coarse waypoints (~5–8 per segment). The sampled elevation profiles are approximate — a real pipeline alignment would have hundreds of waypoints from route optimisation.
No hydraulic transient model
This analysis covers static head and friction (steady state). Water hammer (hydraulic transient) analysis is required for pump start/stop events — particularly on the T1 escarpment with 1,392m of static head.
Land cover not included
Rock, sand, gravel, and clay have very different trenching costs. This analysis uses gradient only — actual constructability analysis requires combining gradient + geology from field investigation.
±5m DEM accuracy in highlands
Copernicus GLO-30 has stated ±5m vertical accuracy in rugged highland terrain. For the T3 gravity trunk (net Δ≈0m), a 5m error could move the balance point and flip the gravity feasibility conclusion.
No optimised routing